MikeMc88

2018 Highline
T6 Pro
Is it best to do the electrics before I carpet and lay the altro flooring?

I was hoping to do the carpeting first but I was just speaking to a local converter and he said to do the electrics either before or at the same time.

My original plan was to put down the 12mm floor then lay the altro. Then on to carpet and finally the electrics.


Now I am thinking.....Electrics, Carpet and finally altro flooring. Would this be the best order?
 
As you stated last, electrics, carpet and floor. Run some extra cables for future use.
 
Back
Top