Is it best to do the electrics before I carpet and lay the altro flooring?
I was hoping to do the carpeting first but I was just speaking to a local converter and he said to do the electrics either before or at the same time.
My original plan was to put down the 12mm floor then lay the altro. Then on to carpet and finally the electrics.
Now I am thinking.....Electrics, Carpet and finally altro flooring. Would this be the best order?
I was hoping to do the carpeting first but I was just speaking to a local converter and he said to do the electrics either before or at the same time.
My original plan was to put down the 12mm floor then lay the altro. Then on to carpet and finally the electrics.
Now I am thinking.....Electrics, Carpet and finally altro flooring. Would this be the best order?