Hi all
First post here but been a vip member and t6 owner for many years
My issue is that i have just fitted a brand new crate engine from VW along with new Delphi high pressure pump, filter and delphi fuel rail from PH Jones in my 2018 150bhp CXHA 2.0 4motion T6
I am using VCDS and have coded in the injectors and bled the system, the van is now starting and seems to idle smoothly however I have not allowed to to run for any length of time as the workshop manual states that after replacing hpfp and rail the learned values need to be reset
Can anyone clarify the procedure in vcds to do the reset of these?
Also will i need to reset the values for any other parts on the new engine?
Everything engine related has been replaced including the turbo, catalytic converter, dpf and all exhaust sensors on cat, complete fuel system, dual mass and clutch
First post here but been a vip member and t6 owner for many years
My issue is that i have just fitted a brand new crate engine from VW along with new Delphi high pressure pump, filter and delphi fuel rail from PH Jones in my 2018 150bhp CXHA 2.0 4motion T6
I am using VCDS and have coded in the injectors and bled the system, the van is now starting and seems to idle smoothly however I have not allowed to to run for any length of time as the workshop manual states that after replacing hpfp and rail the learned values need to be reset
Can anyone clarify the procedure in vcds to do the reset of these?
Also will i need to reset the values for any other parts on the new engine?
Everything engine related has been replaced including the turbo, catalytic converter, dpf and all exhaust sensors on cat, complete fuel system, dual mass and clutch

