Hi all, new on here and hoping for some help!
Just started planning out my conversion and was thinking about the routing for the electrics and what order to do things..
I've sound proofed and insulated the walls, was thinking about doing the floor next. Do I need to get the electrics in first (sort of 1st fix) and route under the floor then up into the units or do you put the floor in first and route through the walls?
Some converters seem to lay the ply directly on the floor but that wouldn't leave a void for cable.
Pretty much all the electric requirements will be on the drivers side so under the floor and up into units seems sensible but not sure.
Just wondered how you all tackled it!
Cheers
Just started planning out my conversion and was thinking about the routing for the electrics and what order to do things..
I've sound proofed and insulated the walls, was thinking about doing the floor next. Do I need to get the electrics in first (sort of 1st fix) and route under the floor then up into the units or do you put the floor in first and route through the walls?
Some converters seem to lay the ply directly on the floor but that wouldn't leave a void for cable.
Pretty much all the electric requirements will be on the drivers side so under the floor and up into units seems sensible but not sure.
Just wondered how you all tackled it!
Cheers