How long to make t6.1 shuttle

Can anyone tell me how long does it take to build a t6.1 at the factory?
Well, the factory was pushing out 180,000 a year back in 2017, so around 500 a day. Theres a couple of YouTube videos on the factory which shows some of the main production line (Which is where I got the numbers).

Doesnt say how long to build a single vehicle, but with that kind of volume per day, I’d suggests a few hours tops. A lot of the components are pre-assembled on seperate lines (engine etc) and then it all comes together on the main assembly line
 
Depends on the spec mate. Some options, engines are causing delays due to lack of parts. Pot luck on build weeks from what I can see.
 
I have a lwb shuttle bus that is being built on the 1st of March just trying to judge how long to get here
Ah, now that question is easier. Most dealers are saying 4-5 weeks from built date to delivery at van centre. Some have been appearing a bit quicker recently.

My PV is due for build the same week and dealer reckons he should have it by end of March
 
Back
Top