I’ve looked through the engine manual, and this is what it says about fitting a new turbo, so that’s what I’m going to do.
Install in reverse order of removal, observing the following:
– Observe tightening sequence for turbocharger ⇒ page 215 .
– Renew seals, gaskets, O-rings and self-locking nuts after removal.
– Fill turbocharger with engine oil at connection for oil supply line.
– Hose unions and air intake pipes and hoses must be free of oil and grease before installation.
– Secure all hose connections with the correct type of hose clips
(same as original equipment) ⇒ Electronic Parts Catalogue .
– After installing turbocharger, run engine for about 1 minute at idling speed to ensure that oil is supplied to turbocharger. Do not rev engine immediately.
After new components have been installed (engine/short engine, cylinder head, camshaft housing or turbocharger) the oil pressure control must be set to max. pressure for approx. 1000km if the function is available in the engine control unit. This will compensate for the increased friction during run-in of new components, and a better transport of wear related particles is guaranteed.
– Connect ⇒ Vehicle diagnostic tester.
– Switch on ignition.
– Activate oil pressure regulation ⇒ Vehicle diagnostic tester,
01 - Systems capable of self-diagnosis, 01 - Diesel
01 -
Adaption, direction injection and preglow system EDC 17, Engine electronics functions, Oil pressure for engine operation.
– Follow further instructions displayed on ⇒ Vehicle diagnostic tester.