Im having some delivery delays on a Lensun solar panel I ordered at the start of the month. The panel I've ordered isn't in the UK.
To be fair to Lensun they let me know straight away, suggesting a 10 day delay, which I said was fine. However we are now on a 3rd delay to that with them now saying 10th August.
I'd prefer not to delay anymore as we have a 2 week trip booked from the 15th. However that isn't a deal breaker.
This is the panel I'd ordered, a 150w 12v semi flexible panel.
They have offered me 2 of these 80w 12v semi flexible panels as an alternative, with no additional cost to me.
We have a CTEK D250SE fitted on the van, which has a max input of 23v. Both panels (150w and 80w) have a open circuit voltage of 21.24v, but how is that affected with 2 panels?
If I went with the 2 panel option would I set them in parallel?
Would you take them up on the offer of the alternative panels?
To be fair to Lensun they let me know straight away, suggesting a 10 day delay, which I said was fine. However we are now on a 3rd delay to that with them now saying 10th August.
I'd prefer not to delay anymore as we have a 2 week trip booked from the 15th. However that isn't a deal breaker.
This is the panel I'd ordered, a 150w 12v semi flexible panel.
They have offered me 2 of these 80w 12v semi flexible panels as an alternative, with no additional cost to me.
We have a CTEK D250SE fitted on the van, which has a max input of 23v. Both panels (150w and 80w) have a open circuit voltage of 21.24v, but how is that affected with 2 panels?
If I went with the 2 panel option would I set them in parallel?
Would you take them up on the offer of the alternative panels?